Inorganic Waste Treatment | Suranaree University of Technology

    Comprehensive waste management plant



    Prototype of oil production plant from waste fuel



    Organic Waste Composting Machine

    Biogas Power Plant

    1. Comprehensive waste management plant

    The Integrated Solid Waste Sorting Plant manages organic and inorganic waste using Mechanical Biological Treatment (MBT) or Composting technology. Reduction choppers, composting systems, and gliders to sort organic fertilizers and plastics to process waste into energy. The by-products are soil amendment materials and Refuse Derived Fuel (RDF). Recycle Biomass fuels, waste fuels and soil amendment materials 2,113.82 tons/year, or 97.30%, of which was sold as income to the Environmental Fund in the amount of Baht ..................... million/year and allocated funds for research and environmental protection activities within the university.

     Success of Inorganic Waste Management

    No. list unit accomplishment
    1. Waste fuel production tons/year 2,113.82
    2. Creating income from selling waste fuel. THB/year
    3. Reduce greenhouse gas emissions ton CO2e/ year

    Link : http://biomass.sut.ac.th/biomass/?page=Vdo/vdoShow&id=1

    Link : https://www.youtube.com/watch?v=orRCfKlhsYc

    2. Prototype of oil production plant from waste fuel

    The system uses 5 tons of plastic waste per day. It can produce about 4,000 liters of oil per day using plastic waste from the MBT system and waste fuel plant (RDF-4) of the university as fuel for the system's operation. Through this process, a blended fuel product is obtained. The resulting oil is distilled using a prototype. The university's commercial refinery can be used for engines and machinery.

    Link : http://biomass.sut.ac.th/biomass/?page=Article/articleShow&id=5

    3. Organic Waste Composting Machine

    The university has established a project to manage organic waste at the source by campaigning for the separation of food waste in office buildings, dormitories, academic buildings and cafeterias within the university and bringing it into the process using organic fertilizer production technology through a prototype machine of the vertical stirred aeration organic fertilizer production system SUT-MBT Pilot Plant with a capacity of 0.5 Tones/Batch (8 m3). It defines the carbon to nitrogen ratio (C/N ratio) used for decomposition in the fermentation process. It has a fermentation period of 45-60 days (about 6-8 weeks) and controls the system's temperature to be within a range suitable for microbial working conditions. The temperature is controlled to a range of 60 degrees Celsius.

    4. Biogas Power Plant

    The university has researched and developed to increase the efficiency of biogas production from Napier grass and municipal waste (CSTR prototype plant level of 300 cubic meters) and found that the biogas production potential of mixed raw materials is 62.56 cubic meters per ton of raw materials. The average proportion of %CH4 is approximately 55.20%, with biogas production capacity of 182 cubic meters/day (feed rate of Napier grass raw materials 1.5 tons/day and pretreatment organic waste 1.5 tons/day, including mixed feedstock feed of 3 tons/day). Using pretreated organic waste from the SUT-MBT system as raw materials mixed with Napier grass to produce biogas can be expanded to industrial applications.